top of page
Design Build
St. Johns Hospital
166 Caisson Foundations Installed
2.5 ft. to 11 ft. Diameter Shafts
10 Unique shafts had 15ft. to 16ft. diameter inverted bells midway down for uplift control. This was value engineered by Rohrscheib Sons Caissons (patent pending on beller) and a pioneer design having never been done before. The owner realized $200,000.00 in savings.
Featured in ADSC and Structure Magazines
See how we did it here:
bottom of page