Limited Access
Ford Woodhaven
Ford Woodhaven Stamping Plant
78 Caissons and 48 Tie Rod Sleeves Completed to Date
-
Multiple Press Pits Completed with 4 Total Mobilizations
-
20" Dia. Tie Rod Sleeves Installed with 1" Centerline Tolerance
-
4'-0" & 4'-6" Caisson Diameters
-
Drill Depth up tp 65'
-
8 to 15' Rock Sockets Through 15,000 PSI Limestone Bedrock
-
Engineered Equipment Pick Plan for Each Phase of Work
-
All Work Completed Indoors with Low Overhead Restrictions
-
Worked Double Shifts to Meet Owners Schedule