Electric
LG & E Transmition Line Foundations
4 ft. to 11 ft. Diameter Shafts
Over 50 Caisson Foundations Installed
Monopoles
Provided a quality product from start to finish. With over 55 years of experience in this area of foundation work, RSC has profected the installation procedures for transmition line work.
Three Leg Towers
Custom fabricated templates used to set and pour all three caissons in one day with precise alignment.
Four Leg Towers
One ton tower leg stubs embeded directly into the caissons.
Custom fabricated templates used to set and pour all four caissons in one day with precise alignment.
60 ft. Drill Depth
Advanced the shafts with a polymer slurry through wet granular soils.
Limited access and low overhead clearance.